MTEIRDC Campus Buildings

Project Overview

MTEIRDC Campus Buildings

Located in Addis Ababa, the Advanced Laboratories and Facilities Building project for MTEIRDC spans a 30,125 m² site with a total floor area of 55,000 m². Our firm delivered design, supervision, and contract administration services for this 3.3 billion Birr development, featuring specialized labs, workshops, dormitories, and multipurpose buildings to support advanced manufacturing and research.

Project Informations

Project Name:

Advanced Laboratories and Facilities Building Construction (MTEIRDC)

Project Location:

Addis Ababa, Ethiopia

Client:

Manufacturing Technology & Engineering Industry Research & Development Center (MTEIRDC)

Project Cost:

3,300,000,000.00 Birr

Project Year:

2021

Project Details

The Advanced Laboratories and Facilities Building Construction project, commissioned by the Manufacturing Technology & Engineering Industry Research & Development Center (MTEIRDC), is a major institutional development in Addis Ababa city. Covering a site area of 30,125 m² with a total floor area of 55,000 m², the project is designed to provide state-of-the-art infrastructure for research, training, and advanced manufacturing.


Scope of Services: Our firm was responsible for the full spectrum of architectural services including:

  • Conceptual and detailed design tailored to the complex needs of manufacturing technology and research
  • Construction supervision to ensure quality, compliance, and timely delivery
  • Contract administration to manage project coordination, scheduling, and budget control


Project Components: The project comprises a diverse range of buildings and facilities, including:

  • Main Gate and Guard House (G+1): Secure access control and welcoming point.
  • Research Laboratory (B+G+6): Multi-story facility equipped for advanced scientific research.
  • Advanced Welding Laboratory, Foundry Workshop, Fabrication/Advanced Manufacturing Buildings (G+0): Single-level specialized workshops supporting core manufacturing processes.
  • Assembly Hall and Syndicate Rooms: Collaborative spaces located above existing buildings.
  • Display, Training Rooms, and Multipurpose Building (2B+G+12): Large-scale facilities for exhibitions, training, and multifunctional use.
  • Trainers Cafeteria (G+0): Dining amenities for staff and visitors.
  • Clinic Building (G+3): On-site healthcare services.
  • Dormitory Buildings (G+4 and G+2): Accommodation for trainees, coaches, and teachers.
  • Office and Store (G+0): Administrative and storage support spaces.
Site Area

30,125.00 M2

Built-up Area

3,670.00 M2

Floor Area

55,000.00 M2